Log and resolve defects
Snag List Management
Schedule inspections, record defects with photo evidence, assign rectification and re-inspect — through to a formal clearance certificate, with the Defects Liability Period tracked after keys.
Digital snagging reports
Room-by-room inspections with photo capture per defect, categorised Major / Minor / Cosmetic.
Contractor assignment
Each defect routes to the right contractor with rectification deadlines and SLA tracking.
Re-inspection & clearance
Re-inspections schedule after contractor sign-off; the clearance certificate generates once every item closes.
DLP tracking
Buyer-reported defects during the Defects Liability Period are logged, assigned and formally closed — repeat defects escalate.
Ready to replace the chaos?
Schedule a demo and see the full platform mapped to your exact workflow.